The unplanned shutdown of Freeport LNG has put downward pressure on the Houston Ship Channel (HSC) basis. Supply that otherwise would have fed the 2 Bcf/d LNG terminal, located south of Houston, is now being backed up into the Gulf Coast market. For more on the Freeport outage read here.
The next four months of HSC basis have fallen around 24c since early June, when the fire at Freeport broke out. The weakness in HSC coincides with the anticipated outage duration of the Freeport LNG facility. Notice how the rest of the HSC forward curve beyond October is nearly unchanged.




